04 NIVEN’s raw material base
Every natural-stone project begins with understanding its origin.
Novoselivskegranitedeposit
The Novoselivske Granite Deposit is NIVEN’s principal raw material base. Its primary mineral is granite suitable for block extraction. This quality defines the company’s specialisation and the commercial potential of Novoselivske stone for professional processing, architecture, construction and landscaping.

Novoselivske quarry · NIVEN raw material base
01 Location
In the south of the Ukrainian
Crystalline Shield
The deposit lies 250 metres northwest of the western edge of Novoselivka village, in the Pervomaisk district of the Mykolaiv region.
The terrain is a plain gently sloping to the southeast and divided by valleys and ravines. The quarry is located on the slopes of the Akhtenivka ravine.
2.002 Geological foundation
Stone formed
deep in time
The Novoselivske Deposit belongs to the southwestern part of the Lower Proterozoic Kirovohrad granite complex.
The deposit was studied in several stages. Initial exploration took place in 1973–1974. In 1989–1991, it was further investigated and reassessed specifically as a source of granite blocks.
In 2022–2023, NIVEN carried out a geological appraisal of the deposit. The resulting reserves were reviewed and approved by the State Commission of Ukraine on Mineral Reserves under protocol No. 5619.
03 Stone character
One granite.
Different perspectives.
The crystalline rocks are predominantly medium- to coarse-grained, porphyritic garnet-biotite granites. Light crystals create rhythm, while dark inclusions give the pattern natural depth.


Natural stone may show acceptable variations in shade, grain and pattern. The characteristics of a specific block or consignment are agreed during ordering.
04 The deposit in detail
Modern technology.
Responsible extraction.
Granite block extraction at the Novoselivske Deposit is based on controlled separation from the formation, precise block shaping and specialised quarry machinery. Modern equipment helps preserve the integrity of the natural stone and use the raw material efficiently.
The deposit is developed in accordance with approved designs and current environmental requirements.
Controlled separation of the natural formation.
Preserving the integrity and usable volume of the stone.
Work in line with approved designs and current requirements.


05 Legal basis
Official right
to use the subsoil
NIVEN LLC uses the subsoil of the Novoselivske Deposit under a valid special permit and in accordance with Ukrainian law.
06 Commercial enquiry
Receive information
on available blocks
Provide the approximate project requirements. We will prepare information on availability, dimensions, the characteristics of specific blocks and loading terms.
Email for direct contactteam@niven.com.ua